Turbo Power Systems start work on key parts for Metro’s new train fleet

What the new Metro train will look like
23 February 2022

A Gateshead-based company is starting work on key components for the Tyne and Wear Metro’s new £362m train fleet.

Turbo Power Systems (TPS), who are based at the Team Valley, are producing electric converters for all 46 new Metro trains on behalf of Stadler.

Stadler, the Swiss train manufacturer that is building the new Metro fleet on behalf of of Metro operator Nexus, appointed TPS last year, demonstrating its commitment to support the regional economy - and to using as many local firms as possible for the build and maintenance of the new trains.

The first new Metro train is set to arrive in the region at the end of 2022.

Head of Fleet and Depot Replacement Programme at Nexus, Michael Richardson, said: “It’s fantastic to see another company from North East England starting work on supplying essential components for our new £362m train fleet, which is going to transform Metro services for customers. 

“Gateshead based Turbo Power Systems are making vital parts for the new trains’ electrical traction systems. It’s a major element of the project and both Nexus and Stadler are delighted to be working with them.

“This shows that there is work for local firms in the Stadler supply chain. Stadler are committed to using local suppliers where possible and this helps to secure jobs and drive inward investment into our region as well as other parts of the UK.”

Adrian Wetter, Project Manager for Stadler, said: “The start of the process to manufacture electric converters not only marks an important stage in the production of new trains for the Tyne and Wear Metro, but brings to life Stadler’s pledge to invest in the north east economy and use as many local suppliers as we can over the course of our 35-year contract.” 

John Boylan, Project Manager for TPS, said: “We are thrilled to be working with Stadler on this exciting local project and passing of FAI and moving into production manufacture of converters; which is a major milestone for both TPS and the project as a whole. We look forward to delivering this converter and are sure this is just the beginning of a prosperous relationship with Stadler.”

“This shows that there is work for local firms in the Stadler supply chain. Stadler are committed to using local suppliers where possible and this helps to secure jobs and drive inward investment into our region as well as other parts of the UK.”

Turbo Power Systems are making electric converters, an essential component of the train’s traction system, acting as the interface between the pantograph and the power converters. They have an essential safety function for the propulsion system. 

Hired by Stadler in June 2021, TPS is a flagship clean tech north east company, which designs and manufactures cutting-edge power and energy conversion systems for the transport, industrial and energy sectors. All of their products are designed and made at their factory in Gateshead. 

Stadler’s appointment of TPS reflects its pledge to boost the regional economy and involve as many Tyne and Wear-based companies in the new trains project as it can. It is keen to use local suppliers for materials and services required for the depot re-build, the manufacturing of the new trains and the ongoing service and maintenance of the trains on the patch. More than 90 per cent of the suppliers used for the depot build project are based in the UK, with key suppliers from the north east region, including Thompsons of Prudhoe and A&M Electricals in Washington.

Currently, the main components of the first new Metro train are being fitted, including  the wheels, seats, equipment cases, piping, wiring, flooring, windows and other internal furnishings, in a process known as final assembly, which started just before Christmas. Over the next couple of months, the process to make the bogies will resume, and then bodyshells attached to the bogies.

The new Metro trains, which will cut energy consumption by 30%, will have modern features including charging points, air conditioning and a step-change in accessibility.

Stadler is also in the process of building a new £70m Metro depot at Gosforth as part of the new fleet project.

Find out more at www.nexus.org.uk/newmetrotrains 
 

Videos

Turbo Power Systems - profile

The new Metro train fleet - CGI

© 2022 Nexus Tyne and Wear - Public Transport and Local Information.